The report reads the cost tool. Nobody retypes.
Once both tools sit on the same project, a project report can pull from Commercials in three ways. Charlo fetches and formats the numbers. You decide what the client sees, and when it is signed off.
·Three kinds of feed
Take as many as the report needs.
- Figures. Five headline numbers for the cover cards: Approved budget, Committed cost, Forecast final cost, Variations approved, Claims certified.
- Tables. Ready-made cost views as report sections: Budget Position, Cost Summary, Financial Summary, Variation Register, Claims Position.
- Charts. Commercials visuals as their own sections, such as Budget, committed and certified by category, and Committed by vendor.
- Everything else stays yours. Commentary, photos, programme and risks are still written in the report.
·Live while you draft, frozen when you issue
The same connection behaves differently either side of publish.
- Draft. Every wired item reads the live figure each time the report opens.
- Published. The figures stop moving, and the panel turns read-only.
- Changing an issued report. Click Unpublish report in the banner, make the change, publish again.
- The full rules are in Publish and revisions, further down this page.
Check the tools are linked to one project.
Nothing can be wired until the report and the cost tool agree on which job they are talking about. That agreement lives in Project Central, and these days it is made for you.
·New projects arrive already linked
Project setup does the linking as it builds the project.
- Create the project through Create project in Project Central and the wizard makes a Project Reporting, Meeting Minutes, Commercials and Registers project, links all four, and switches on the data flows between them.
- Each tool sits in its own slot with a Live chip and an Open button.
- The Linked tools and data flows area underneath reads All connections healthy.
·Check you have finished
One chip tells you the whole story.
- Read the linked count beside Save changes, such as 4/4 linked.
- For this guide, Commercials and Project Report both have to be on the project.
- The same count shows against every project in the list on the left.
Wire it, check it, issue it.
Add connections one at a time when you know what you want, or take the standard pack when you do not.
01Open the connections panel
It lives in the builder toolbar.
- Open Project Reporting, pick the project, open the month in the Builder.
- Click Connections, between Cover cards and Project settings.
- Read the groups in order: Cover cards, then Table sections. Chart sections join the list once the report has them.
- Click Open on any row to jump to that item in the builder.
02Add one thing at a time
Use this when you know exactly what the report needs.
- Click + Add.
- Under Figures, click a headline figure to add a cover card wired to it.
- Under Tables, use Or link a Commercials Management view, pick the view, then click Link.
- Under Charts, click a visual to drop it in as its own section.
- Click Back to connections to see the result.
03Or take the standard pack
The quick way to get a new report reading.
- Look for Nothing here reads from Commercials yet at the top of the panel.
- Click Wire the standard pack.
- Or click + Add one at a time to pick your own instead.
04Look at what it added
One click, ten connections, all reading.
- Read the confirmation line, Added 4 cards, 4 tables, 2 charts.
- Tables: Budget Position, Cost Summary Report, Financial Summary and Variation Register.
- Every new row carries an orange Commercials chip and a Live chip.
- Remove anything the client does not need, the same way you would any other section.
05Check the connections before you publish
A dry run of the publish checks. It locks nothing.
- Click Check connections at the top of the panel, or Check in the builder toolbar. Same check, two buttons.
- Read the result, such as All 19 linked connections check out. with the time it was checked.
- Ticked items are reading. Red items name what cannot be read.
- Fix anything red, then check again.
Publish and revisions.
Publishing (you may also hear issued, locked or frozen) freezes the report: every linked figure, table and chart stops reading and keeps the numbers it had. To change a published report you unpublish it, edit, and publish again.
The five chips.
Every row in the panel carries one. It is the fastest read of whether the report is telling the truth.
Which month you are reading.
Commercials banks its figures by calendar month, and every row prints the month it reads.
Next month's report.
You wire a report once, not every month.