Every claim walks the same five stages.
Raise it, attach the files, assess it, certify it, issue the certificate. The strip across the top of the workspace shows where this month's claim has got to. Before you start you need a Claim schedule commitment with its schedule of values behind it, which is guide 09.
·The claim journey
One commitment, one workspace, one strip.
- Raise. Open a draft claim for a period, such as 2026-08.
- Claim files. Optional supporting files, such as the vendor's claim.
- Assess. Set what you certify against each line.
- Certify. Applies retention and GST and settles the claim.
- Certificate. Issue it from a template.
·The claim schedule position
Where the money sits on every line, right now.
- Click the Contract bar in the workspace to expand it.
- Contract value, certified to date, this claim, cost to complete, % complete, per line.
- Parents are subtotals. Charlo derives them from the lines beneath, so they cannot be typed on.
- Total is pinned at the bottom and has to equal the adjusted contract sum.
- Manage claim schedule and Open claim assessment sit above the table.
Raise it, assess it, certify it.
All of it happens under Commercials, on Cost control, then Claims. Nothing is settled until you certify, so work the sheet as often as you need.
01Open the commitment
The Claims tab is a card per commitment.
- Open Commercials, pick the project, go to Cost control then Claims.
- Each card shows the vendor, the adjusted contract sum, certified to date and a progress bar.
- The badge says how it claims: Claim schedule or Base fee.
- Click the card to open its claims workspace.
02Raise the month's claim
Drop the vendor's PDF, or enter it yourself.
- Click Raise claim, top right of the workspace.
- Drop PDF here hands the vendor's claim to Charlo, which reads the details out of it. The read carries on in Task Centre if you close the review.
- Enter manually is the guided form when you already know the claim.
- Either way, confirm the Claim period, such as 2026-08, and click Raise claim. The claim lands as a draft and the assessment sheet opens.
03Read the assessment sheet
The claim schedule, turned into a working sheet.
- Raising the claim opened it. To come back later, click Open claim assessment in the Contract bar, or the 3 dot on the strip.
- The header carries the adjusted contract sum, previously certified, the draft certified amount and the draft remaining to complete.
- Parent rows are derived, with a caret to fold them away and greyed cells you cannot type on.
- Bottom lines have boxes: this payment, this payment %.
04Work down the bottom lines
Charlo does the adding up while you type.
- Set the amount you are prepared to certify on each bottom line.
- The parent above it moves as you type, and so does the total.
- Cost to complete updates on every row, so overclaiming shows itself.
- Remove and + Add line item change this claim's sheet only. Neither rewrites the commitment's claim schedule.
- Save assessment keeps the work without certifying.
05Compare it with the vendor's claim
Their figures beside yours, with the gap called out.
- Click Vendor comparison in the sheet's header. The vendor block appears and the sheet scrolls wide.
- Vendor's claim is their cumulative claim. Vendor's previous is what they had claimed before this one. Vendor's amount is what they are asking for this claim.
- Assessment less vendor shows in red where you are certifying less than they asked for.
- Click the pill again to hide the block.
06Certify, and what that locks
The point where the claim stops being a working document.
- Click Certify when every line reads correctly.
- A confirmation names the figure: Certify $75,000.00 ex GST. Retention will be calculated from Claim setup, then GST and the payable total will be frozen. Click Certify claim.
- Charlo works out retention held, GST, amount due this certificate and total payable, and freezes them in the sheet's header.
- The sheet turns read only with a Certified chip, and Issue certificate lights up on the ledger row.